Machinery Part Forged Steel Crane Gantry Rail Wheel Crane Rail Trolley Wheel

Customization: Available
Processing Object: Metal
Molding Style: Forging

Product Description

Basic Specifications
Model NO.
Forged Wheel
Molding Technics
Pressure Casting
Application
Machinery Parts
Material
Steel
Heat Treatment
Quenching
Surface Treatment
Polishing
Forging Tolerance
+/-0.1mm
Standard
GB
Certification
CE, RoHS, ISO 9001:2000, ISO 9001:2008
Hardness
200-400 Hbr as Demand
Testing
Ut+Mt
Specification
250mm-1250mm
Product Overview
Machinery Part Forged Steel Crane Gantry Rail Wheel Crane Rail Trolley Wheel
ItemForged Wheel
DesignTailor-made at customer's design and request
ApplicationCrane Wheel, Hydro Dams Gate Wheel, Freight Wagon Wheel, Passenger Coach Wheel, Locomotive Wheel
MaterialSAE4140, SAE4150, SAE4160, 42CrMo, AAR-M107 Class B/C, Stainless Steel 410/304
StandardAAR M-101, UIC 811-1, EN13261, GOST 31334, IRIS 16/95, KSR 9220, BS 5892, JIS E4502
Size RangeDiameter 250mm to 1250mm
MOQ1 pc
Forged Steel Wheel
Wheel Detail 1 Wheel Detail 2 Wheel Detail 3
Manufacturing Process
  • Free forged or module forged
  • Rough machining to remove oxidized surface
  • 100% Ultrasonic Test (ASTM A388)
  • Customized Heat Treatment (Normalized, Quenched, Tempered)
  • Hardness testing and Finishing process
  • 100% Magnetic Test (ASTM E709) and Dimensional test
  • Anti-rust oil protection (TECTYL 506 or similar)
  • Secure box packaging
Manufacturing Process
Quotation Requirements
Technical Drawing

To provide an accurate quote, please provide:

  • Your own technical drawings
  • Specific material requirements
  • Necessary dimensional data
  • Application environment for recommendations
Company Profile
Factory Overview

We are a professional supplier established in 2012, specializing in material handling equipment, OEM machinery parts, and various forging/casting components. Our product range includes cranes, hoists, magnets, hooks, wheels, drums, axles, and flanges applied in Mining, Hydro power, Transportation, and Construction.

With 5 reliable manufacturing facilities, we ensure stable supply and fast delivery. Our products are exported to more than 50 countries including the USA, Britain, Japan, Russia, and India.

Production Facility 1 Production Facility 2 Quality Control
Testing and Packing
Frequently Asked Questions
How about your delivery time?
Generally, it will take 7-30 days after receiving your advance payment. The specific time depends on the items and the quantity of your order.
Can you produce according to the samples?
Yes, we can manufacture products based on your physical samples or technical drawings provided.
Do you test all your goods before delivery?
Yes, we perform 100% Ultrasonic test, Magnetic test, or Liquid Penetration tests before delivery to ensure quality.
How do you ensure quality management?
Our quality management system conforms to ISO 9001:2015 requirements. We provide video documentation of the manufacturing, testing, and packing process.
How can I deal with the risk of not seeing the goods in person?
We are verified by professional bodies like DNV. We accept trial orders to enhance mutual trust and provide full transparency through process videos.

Related Products